PU 100 1K
Moisture-curing one-component PU surface primer and moisture barrier
PU 100 1K is a moisture-curing, reactive, one-component polyurethane surface primer. It is used as an adhesion primer and dust inhibitor on concrete or asphalt under PU and acrylic coating systems, and as a moisture barrier before screed mixtures.
- Contains no fillers or pigments
- Flexible
- Low viscosity – penetrates capillaries
- Effective against negative pressure
- No volatile organic structures
- Role in the system
- Primer
- Consumption
- 130–150 g/m²
- Packaging
- 10 kg and 20 kg original tin packaging
Technical data
- Density (25 °C)
- 1.13 g/cm³
- Viscosity (25 °C)
- 400 mPas
- Solids (by weight)
- 100 %
- Pull-off adhesion
- 3.6 MPa
- Drying time
- 30–40 min
- Consumption (1 layer)
- 130–150 g/m²
- Application temperature
- min. +10 °C
- Application rel. humidity
- 40–90 %
- Pot life (20 °C)
- 3–4 h
- Interval between layers
- 3–4 h (topcoat: min. 24 h)
- Curing time (20 °C)
- 7 days
- Shelf life
- 6 months (unopened)
Typical values. The technical data sheet is the binding reference.
Usage areas
- Adhesion primer and dust inhibitor under PU and acrylic floor coatings
- Moisture barrier on floors before screed application
- Protective topcoat for concrete screed, terrazzo, wood and artificial stone against chemicals, abrasion and dust
- Reinforcement of weak substrates by penetrating into concrete – indoors and outdoors
Advantages
- Contains no fillers or pigments
- Flexible
- Low viscosity – penetrates capillaries
- Effective against negative pressure
- No volatile organic structures
- Easy to apply with roller and brush
- Fast service time
Application
- Surface preparation. New concrete must cure for at least 21 days. Remove laitance, old paint, oil and dust; neutralise if required. Roughen dense, shiny surfaces. The floor must be completely dry.
- Application. Ready to use. Apply with brush, roller or squeegee in a homogeneous, smooth layer on clean, dry surfaces.
- Next layer. Recoat after 3–4 h at 20 °C; wait at least 24 h before the topcoat. Final strength develops after 2 days.
Important: the cured film must not be exposed to chemical or mechanical loads during the 7-day curing period.
Packaging and storage
- 10 kg and 20 kg original tin packaging
- Store unopened, protected from moisture, water and sunlight.
- Shelf life: 6 months in unopened packaging.
- Use opened packs as soon as possible.
Safety
- Irritating in contact with skin; harmful if inhaled.
- Wear protective clothing, goggles, mask and gloves.
- On contact, rinse with plenty of water for at least 15 min; seek medical advice if necessary.
- Non-hazardous when cured. See the SDS.
Documents
Planning a project?
Send the area, substrate and location — we will recommend a system and connect you with a local applicator.