Manufacturer of sports & industrial surface systems since 2001 · Made in Türkiye

PU 100 1K

Moisture-curing one-component PU surface primer and moisture barrier

PU 100 1K is a moisture-curing, reactive, one-component polyurethane surface primer. It is used as an adhesion primer and dust inhibitor on concrete or asphalt under PU and acrylic coating systems, and as a moisture barrier before screed mixtures.

  • Contains no fillers or pigments
  • Flexible
  • Low viscosity – penetrates capillaries
  • Effective against negative pressure
  • No volatile organic structures
Role in the system
Primer
Consumption
130–150 g/m²
Packaging
10 kg and 20 kg original tin packaging
Colours
Clear

Technical data

Density (25 °C)
1.13 g/cm³
Viscosity (25 °C)
400 mPas
Solids (by weight)
100 %
Pull-off adhesion
3.6 MPa
Drying time
30–40 min
Consumption (1 layer)
130–150 g/m²
Application temperature
min. +10 °C
Application rel. humidity
40–90 %
Pot life (20 °C)
3–4 h
Interval between layers
3–4 h (topcoat: min. 24 h)
Curing time (20 °C)
7 days
Shelf life
6 months (unopened)

Typical values. The technical data sheet is the binding reference.

Usage areas

  • Adhesion primer and dust inhibitor under PU and acrylic floor coatings
  • Moisture barrier on floors before screed application
  • Protective topcoat for concrete screed, terrazzo, wood and artificial stone against chemicals, abrasion and dust
  • Reinforcement of weak substrates by penetrating into concrete – indoors and outdoors

Advantages

  • Contains no fillers or pigments
  • Flexible
  • Low viscosity – penetrates capillaries
  • Effective against negative pressure
  • No volatile organic structures
  • Easy to apply with roller and brush
  • Fast service time

Application

  1. Surface preparation. New concrete must cure for at least 21 days. Remove laitance, old paint, oil and dust; neutralise if required. Roughen dense, shiny surfaces. The floor must be completely dry.
  2. Application. Ready to use. Apply with brush, roller or squeegee in a homogeneous, smooth layer on clean, dry surfaces.
  3. Next layer. Recoat after 3–4 h at 20 °C; wait at least 24 h before the topcoat. Final strength develops after 2 days.

Important: the cured film must not be exposed to chemical or mechanical loads during the 7-day curing period.

Packaging and storage

  • 10 kg and 20 kg original tin packaging
  • Store unopened, protected from moisture, water and sunlight.
  • Shelf life: 6 months in unopened packaging.
  • Use opened packs as soon as possible.

Safety

  • Irritating in contact with skin; harmful if inhaled.
  • Wear protective clothing, goggles, mask and gloves.
  • On contact, rinse with plenty of water for at least 15 min; seek medical advice if necessary.
  • Non-hazardous when cured. See the SDS.

Planning a project?

Send the area, substrate and location — we will recommend a system and connect you with a local applicator.

Request a quote
Message us on WhatsApp