Manufacturer of sports & industrial surface systems since 2001 · Made in Türkiye

UNEPOX 128-05 2K

Solvent-free epoxy-based primer

UNEPOX 128-05 2K is a two-component, polyamine-cured, solvent-free epoxy primer for concrete. It gives perfect adhesion, good resistance to water and oil, and cures well at low temperature.

  • 100 % solvent-free
  • Perfect adhesion
  • Good resistance to water and oil
  • Good low-temperature cure
  • Easy application
Role in the system
Primer
Consumption
0.350 kg/m²
Packaging
Component A: 13.4 kg · Component B: 6.6 kg
Colours
Brownish hazy

Technical data

Component A / B
Epoxy resin / epoxy hardener
Mass density (20 °C)
1.03 g/cm³
Solids (by volume)
100 %
Surface & room temperature
+10 °C to +30 °C
Coverage at 80 µm DFT
8–9 m²/kg
Gel time, 20 kg (20 °C)
35 min
Touch dry (20 °C)
6–8 h
Overcoating time (20 °C)
24 h
Full cure
7 days
Number of coats
1
VOC content
0.56 g/l
Mixing ratio (by weight)
2 : 1
Shelf life
12 months

Typical values. The technical data sheet is the binding reference.

Primary uses

  • Chemical storage areas
  • Hospitals and laboratories
  • Bottling plants
  • Forklift traffic areas
  • Shopping centres
  • Automotive industry

Advantages

  • 100 % solvent-free
  • Perfect adhesion
  • Good resistance to water and oil
  • Good low-temperature cure
  • Easy application
  • VOC 0.56 g/l

Application

  1. Surface preparation. Clean the surface of grease, dust and contamination. New concrete min. 28 days old. Repair depressions and cracks first.
  2. Mixing. Stir component A, add B (2 : 1 by weight) and mix 3 min with a low-speed electric mixer until homogeneous. Mix temperature above +15 °C.
  3. Application. Apply with a trowel – estimated consumption 0.350 kg/m². Do not thin.
  4. Next layer. Wait min. 24 h / max. 48 h between layers; after 48 h, sand for good adhesion.

Mixing ratio (by weight)

Component Amount
Component A – epoxy resin 2 parts
Component B – hardener 1 parts

Supplied as 13.4 kg A + 6.6 kg B. Never add solvent.

Important: protect the new coating from water for the first 24 hours. Low temperatures cause levelling and bubble problems, high temperatures shorten drying time.

Packaging and storage

  • Component A: 13.4 kg
  • Component B: 6.6 kg
  • Store sealed indoors in dry premises at +14…+35 °C.
  • Shelf life: 12 months from production.

Safety

  • Refer to the latest Material Safety Data Sheet for safe handling, storage and disposal.

Planning a project?

Send the area, substrate and location — we will recommend a system and connect you with a local applicator.

Request a quote
Message us on WhatsApp