Manufacturer of sports & industrial surface systems since 2001 · Made in Türkiye

UNEPOX HB100 2K

High-build, solvent-free anti-slip epoxy topcoat

UNEPOX HB100 2K is a two-component, solvent-free epoxy floor coating containing anti-slip additives. It is designed as a non-slip floor coating for parking ramps, pool edges and slippery areas where safety of production processes and people is crucial.

  • Anti-slip finish
  • Good chemical and mechanical resistance
  • Short curing
  • good low-temperature cure
  • Good levelling
  • seamless
  • Antibacterial and antistatic
Role in the system
Topcoat
Consumption
approx. 4 m²/kg
Packaging
16 kg component A + 4 kg component B in metal cans
Colours
RAL colours

Technical data

Component A
Epoxy resin
Component B
Epoxy hardener
Mass density (20 °C)
1.41 g/cm³
Solids (by volume)
100 %
Surface & room temperature
+10 °C to +30 °C
Pot life, 25 kg (20 °C)
10–25 min
Touch dry (20 °C)
6–8 h
Overcoating interval (20 °C)
24 h (max. 48 h)
Full cure
7 days
Mixing ratio (by weight)
80 A : 20 B
Consumption
approx. 4 m²/kg
Shelf life
12 months

Typical values. The technical data sheet is the binding reference.

Primary uses

  • Parking ramps and pool edges
  • Hospitals and laboratories
  • Chemical storage areas and bottling plants
  • Stores, warehouses and shopping centres
  • Automotive industry

Advantages

  • Anti-slip finish
  • Good chemical and mechanical resistance
  • Short curing, good low-temperature cure
  • Good levelling, seamless
  • Antibacterial and antistatic
  • Easy to clean
  • Good abrasion resistance

Application

  1. Surface preparation. Clean surface free of grease, dust and contamination; new concrete min. 28 days old. Apply an epoxy concrete primer first for good adhesion.
  2. Mixing. Stir component A, add component B (80 : 20 by weight) and mix for 3 min with a low-speed electric mixer (200–300 rpm). Do not thin.
  3. Application. Apply with a roller. Consult Unica technical service regarding thickness and consumption.
  4. Recoating. Wait min. 24 h / max. 48 h between layers; after 48 h sand for adhesion. Protect from water for the first 24 h.

Mixing ratio (by weight)

Component Amount
Component A – epoxy resin 80 parts
Component B – epoxy hardener 20 parts

Supplied as 16 kg A + 4 kg B. Do not thin.

Important: protect the new coating from water for the first 24 hours. Do not thin the product.

Packaging and storage

  • 16 kg component A + 4 kg component B in metal cans
  • Store in sealed containers indoors in dry premises at +14…+35 °C.
  • Shelf life: 12 months from production in a cool, dry place.

Safety

  • Not hazardous; contains no formaldehyde, asbestos, mercury, lead, chromate or derivatives.
  • See the Material Safety Data Sheet (MSDS).

Planning a project?

Send the area, substrate and location — we will recommend a system and connect you with a local applicator.

Request a quote
Message us on WhatsApp