Manufacturer of sports & industrial surface systems since 2001 · Made in Türkiye

UNEPOX MIOX Primer/Topcoat 2K

Solvent-based micaceous iron oxide epoxy primer / topcoat

UNEPOX MIOX PRIMER/TOPCOAT 2K is a polyamide-cured, solvent-based, glossy epoxy protective coating containing micaceous iron oxide pigment. It protects concrete, cement plaster and metal surfaces against atmospheric, chemical and mechanical effects.

  • High chemical and mechanical resistance
  • Undercoat or topcoat
  • Extremely hard and wear resistant
  • Roller
  • brush or spray
  • Resists humidity
  • marine and tropical climates
Role in the system
Primer / topcoat
Consumption
0.180 kg/m² (40 µm DFT)
Packaging
14.4 kg base + 5.6 kg hardener in tin cans
Colours
Metallic grey

Technical data

Specific gravity
approx. 1.25 g/cm³
Solids (by weight)
57 %
Viscosity
900 cP
Gel time
6–8 h
Theoretical consumption
0.180 kg/m² (40 µm DFT)
Interval time
16 h
Touch dry
2–4 h
Full dry
16–24 h
Full cure
7 days
Application temperature
+14 °C to +35 °C
Shelf life
12 months

Typical values. The technical data sheet is the binding reference.

Product use

  • Refineries and petrochemical facilities
  • Metal bridges and pipelines
  • Power and fertiliser plants
  • Railway wagons and buses
  • Waste-water plants, pharmaceutical industry, hospitals
  • Storage tanks and offshore installations

Advantages

  • High chemical and mechanical resistance
  • Undercoat or topcoat
  • Extremely hard and wear resistant
  • Roller, brush or spray
  • Resists humidity, marine and tropical climates
  • Lamellar pigment – UV resistant, no chalking
  • Non-toxic when cured

Application

  1. Surface preparation. Concrete / plaster: cure ≥ 21 days, remove residues, degrease, neutralise if needed. Steel: Sa 2½ or St 3, prime within 4 h – never the next day.
  2. Primer (as topcoat). Submerged metal: UNEPOX ZP or ZRP PRIMER 2K; non-submerged: UNEPOX ZC PRIMER 2K; aluminium / galvanised: UNEPOX WP.
  3. Application. Mix both components and apply by roller, brush or spray gun – 0.180 kg/m² per layer.
  4. Recoating. Interval time 16 h; full dry 16–24 h, full cure 7 days.

Mixing ratio (by weight)

Component Amount
Component A – base 14.4 kg
Component B – polyamide hardener 5.6 kg

Supplied as 14.4 kg base + 5.6 kg hardener in tin cans.

Important: consumption may vary with surface porosity, ambient temperature and application technique.

Packaging and storage

  • 14.4 kg base + 5.6 kg hardener in tin cans
  • Store unopened in original packaging at +15…+35 °C in closed, dry areas.
  • Shelf life: 12 months from manufacture.
  • Protect from sun and frost.

Safety

  • Non-hazardous when cured.
  • Contains no formaldehyde, asbestos, mercury, lead or chromates.
  • See the Safety Data Sheet (MSDS).

Planning a project?

Send the area, substrate and location — we will recommend a system and connect you with a local applicator.

Request a quote
Message us on WhatsApp