UNIPU Sealer 2K
Elastic polyurethane pore-filling coating for poured SBR floors
UNIPU SEALER 2K is an elastic, two-component, thixotropic, solvent-free polyurethane coating for levelling and sealing the pores of poured SBR surfaces in tartan athletics tracks and similar sports systems. It is the pore-filling layer of the L'UNICFLEX MULTI athletics system.
- Solvent-free
- High elasticity
- durability and tear resistance
- High moisture resistance
- optimum curing time
- Can be applied in all weather conditions
- Designed for outdoor durability
- Role in the system
- Sealer / pore filler
- Consumption
- 1.3–1.5 kg/m²
- Packaging
- Kit: 18 kg A + 2 kg B
- Product code
- MM-COA-PU011
Technical data
- Component A
- PU resin (coloured)
- Component B
- Hardener
- Mixed density (20 °C)
- 1.27 g/cm³
- Solids (by weight)
- 99 %
- Application temperature
- +10 °C to +30 °C
- Pot life (20 °C)
- 20–25 min
- Touch dry (20 °C)
- 4–5 h
- Full dry (20 °C)
- 24 h
- Full cure
- 7 days
- Elongation
- 61 %
- Shore hardness (28 days)
- A 80 · D 48
- Consumption
- 1.3–1.5 kg/m²
- Recoat interval
- min. 16 h – max. 24 h
Typical values. The technical data sheet is the binding reference.
Uses
- Pore sealing of poured SBR athletics tracks
- Full polyurethane sports systems
- Multi-purpose SBR and EPDM surfaces
- Basketball, volleyball and handball surfaces, fitness floors
- School indoor play areas and game rooms
- Repair and renovation of existing PU sports floors
Advantages
- Solvent-free
- High elasticity, durability and tear resistance
- High moisture resistance, optimum curing time
- Can be applied in all weather conditions
- Designed for outdoor durability
- Easy to apply
Application
- Surface preparation. Apply after the SBR layer is complete – no primer needed. The surface must be dry, clean and free of dust and oil.
- Mixing. Condition kits to +15…+25 °C. Mix component A 3–4 min at 300–400 rpm, add B, transfer to a clean container, mix 1–2 min and rest 1–2 min.
- Application. Fill the pores with a flat steel trowel to the desired thickness.
- Recoating. Recoat within min. 16 h – max. 24 h. If exceeded, sand the surface for good adhesion.
Mixing ratio (by weight)
| Component | Amount |
|---|---|
| Component A – PU resin (coloured) | 90 parts |
| Component B – hardener | 10 parts |
Supplied as ready-to-use kits (18 kg A + 2 kg B). Never add thinners.
Important: protect the finished coating from water contact for at least 24 hours. Immediate water contact causes a sticky film that must be removed and re-applied.
Packaging and storage
- Kit: 18 kg A + 2 kg B
- Store unopened, sealed packs in cool, dry areas.
- Protect from freezing.
- Shelf life: 6 months from production at +15…+25 °C.
- Opened packs: use within 2 weeks after thorough mixing.
Safety
- Not classified as hazardous; contains no formaldehyde, asbestos or mercury.
- Contains flame-retardant additives.
- Wear workwear, goggles, mask and gloves – the hardener can be irritating.
- Apply in well-ventilated areas. See the Safety Data Sheet (SDS).
Documents
Planning a project?
Send the area, substrate and location — we will recommend a system and connect you with a local applicator.