Manufacturer of sports & industrial surface systems since 2001 · Made in Türkiye

PU Topcoat WB 1K

Water-based aliphatic PUD elastic topcoat

PU TOPCOAT WB 1K is an elastic, water-based aliphatic PUD topcoat – coloured or transparent, matt or semi-gloss. It protects and renews SBR and EPDM sports surfaces and is the optional UV-protective topcoat of the L'UNICFLEX MULTI and 2S systems.

  • High elasticity
  • tear and scratch resistance
  • Excellent adhesion as final layer of L'unicflex Multi
  • High UV resistance
  • aesthetic appearance
  • Can be applied in all weather conditions
  • Water-based – cleaned with water
Role in the system
UV-resistant topcoat
Consumption
0.130 kg/m² per layer
Colours
RAL colours

Technical data

Mixed density (20 °C)
1.29 g/cm³
Solids content
43 %
Surface application temperature
+10 °C to +40 °C
Surface drying time (20 °C)
2 h
Curing time (20 °C)
18 h
Applicable rel. humidity
40–90 %
Full curing time
7 days
Consumption
0.130 kg/m² per layer
Shelf life
9 months

Typical values. The technical data sheet is the binding reference.

Application areas

  • Protective topcoat over poured, tiled or rolled SBR / EPDM surfaces
  • Protective / renewing topcoat on EPDM textures of athletics tracks
  • Economical, quick renewal of worn tile, SBR and EPDM surfaces
  • Fitness and children’s play area floors
  • Elastic matt UV-resistant topcoat for tracks and walkways

Advantages

  • High elasticity, tear and scratch resistance
  • Excellent adhesion as final layer of L’unicflex Multi
  • High UV resistance, aesthetic appearance
  • Can be applied in all weather conditions
  • Water-based – cleaned with water
  • Available in desired RAL colours

Application

  1. Surface preparation. Apply once poured SBR / EPDM starts to cure – no primer. Surface solid, dry, free of rubber residues, oil and paint; renovations need an adhesion test. Min. 3 °C above dew point.
  2. Mixing. Ready to use. Mix with a mixer at 300 rpm for 2–3 min until homogeneous. If necessary dilute with 10–15 % tap water.
  3. Application. Apply two coats of 0.130 kg/m² by airless / air spray, optionally back-rolled with a short-pile velvet roller.
  4. Curing. Protect from direct water contact for the first 6 h; do not apply if rain is expected.

Important: protect the finished coating from water for at least 24 hours. Sudden temperature drops can make the surface dull or stained – in large day/night differences start and finish early.

Packaging and storage

  • Store in original sealed packaging in dry conditions at +10…+35 °C.
  • Protect from freezing.
  • Shelf life: 9 months from production.

Safety

  • Not classified as hazardous in cured state.
  • Contains no formaldehyde, asbestos or mercury.
  • See the Material Safety Data Sheet.

Planning a project?

Send the area, substrate and location — we will recommend a system and connect you with a local applicator.

Request a quote
Message us on WhatsApp