L’unicflex SP
Outdoor PU spray-coated athletic track system. L'UNICFLEX SP is an outdoor athletic track system in which a mixture of SBR granules and prepolymer binder is laid onto the substrate at a specific thickness with a special paving machine.
- Total thickness
- ≈ 14 mm
L’UNICFLEX SP is an outdoor athletic track system in which a mixture of SBR granules and prepolymer binder is laid onto the substrate at a specific thickness with a special paving machine. It is then coated with an elastic polyurethane-based spray coating and finished with line marking. Compliance with sports-surface standards according to DIN 18035/6 has been documented in our laboratories.
Technical performance (DIN 18035/6)
| Test | Requirement | Result | +5 °C | +23 °C | +35 °C |
|---|---|---|---|---|---|
| Vertical deformation | 0.6–2.5 | 1.2 | 1.1 | 1.3 | 1.4 |
| Force reduction | 35–50 % | 38 | 36 | 38 | 41 |
| Tensile strength | > 0.5 N/mm² | 0.67 | – | – | – |
| Elongation at break | > 40 % | 69 % | – | – | – |
| Slip resistance – wet | ≥ 47 DIR A | 78 | – | – | – |
| Ball rebound | 99 % | – | – | – | – |
| Water permeability | N/A | Impermeable | – | – | – |
| Flammability | – | DIN 51960 Class 1 | – | – | – |
Requirement: sports-surface standard limits. Temperature columns: results at the given test temperature.
System components
| Product | Function | Consumption |
|---|---|---|
| UNIPU 045 1K | PU primer for concrete | 0.150 kg/m² |
| UNIPU 060 1K | PU primer for asphalt | 0.150 kg/m² |
| UNIPU 030 1K | PU prepolymer binder | 1.400 kg/m² |
| SBR 1–4 mm | SBR granules | 6.500 kg/m² |
| UNIPU SPRAY COAT 2K | PU elastic spray coating | 1.200 kg/m² |
| EPDM 0.5–1.5 mm | Coloured EPDM granules | 0.600 kg/m² |
| EPDM POWDER | Coloured fine EPDM | 0.050 kg/m² |
| PU TOPCOAT WB 1K (optional) | Water-based PU topcoat | – |
| PU OVERLINE 2K | PU line marking paint | – |
Total thickness ≈ 14 mm (10 mm SBR + 4 mm spray coating + EPDM)
Application conditions
| Condition | Value |
|---|---|
| Application temperature | +15…+35 °C |
| Max. relative humidity | ≤ 85 % |
| Surface temperature | > dew point + 3 °C |
| Moisture in concrete (by wt.) | < 5 % |
| Curing of new concrete / asphalt | 21–28 days |
Documents
Planning a project?
Send the area, substrate and location — we will recommend a system and connect you with a local applicator.